GS / CALCULATOR
Capacitor bank and power-factor correction
Calculate kvar, rated voltage, steps, achieved PF, overcompensation and harmonic warnings.
Start calculating
GS / INPUTS
Preliminary capacitor-bank selection with risk checks
Enter active power, current and target PF, network and capacitor voltage, frequency and step size. Flag nonlinear loads.
Inputs
Calculation method
Qc = P × (tan φ₁ − tan φ₂) · Qnameplate = Qc × (Vc / Vn)²
Interpreting the result
The nameplate rating is corrected for voltage. Leading PF, staging and harmonics require an electrical engineer's review before manufacture.
The result is an initial estimate based on your inputs. Check equipment nameplates, manufacturer data, installation conditions and project requirements before final selection.

